GDS Consulting Contact

Production planning & control

Schedules your plant can actually run.

GDS Consulting implements PlanetTogether advanced planning and scheduling, connects it to your ERP and trains your team. We also build simulation models of your operation, so you can test a new machine, an extra shift or a rush order before you commit.

Simulated shop floor · Tuesdayt = 06:40
LatheMill 1Mill 2Drill Down WO-1001WO-1004WO-1002WO-1006WO-1008 06:0006:2006:4007:00
Every job, changeover and breakdown on every machine, from the GDS simulator.

See your plant run before you change it.

Spreadsheets average things out. Real plants have queues, changeovers, breakdowns and orders that all want the same machine on the same morning. A discrete-event simulation plays out every one of those events, so you see where work actually piles up and what a change is really worth.

The same engine can turn "what if" into "what next": connected to live orders and resources, it produces a finite-capacity schedule that respects machine availability, setups and due dates.

Open the live demo

Where is the real bottleneck?

Utilization, queue length and wait time at every station, including setups and downtime.

Will the new machine pay off?

Add the capacity in the model and watch throughput and lead time move.

Can we hit these due dates?

Run the real order book through the routings and see which jobs finish late.

Which dispatch rule wins?

Compare first-in-first-out, earliest due date, shortest job and same-family sequencing.

How we work

  1. 1

    Assess and plan

    Review your current planning process and systems, agree the goals and build the plan.

  2. 2

    Map and integrate data

    Connect ERP data — items, routings, resources, orders — to the scheduler or the model.

  3. 3

    Build and validate

    Configure the system or model and prove it reproduces how the plant runs today.

  4. 4

    Train and go live

    Training built for your team, and hands-on support through go-live.

  5. 5

    Keep improving

    Ongoing support and optimization so the value keeps growing after launch.

Gavin Swigart

Founder, GDS Consulting

About GDS Consulting

GDS Consulting helps manufacturers get more from their production capacity through better planning and scheduling. We specialize in PlanetTogether advanced planning and scheduling, and in simulation models that show how a plant behaves before money is spent changing it.

Our mission is to deliver projects that are on time, on budget and rich in value — and to leave your team confident running the tools themselves.

  • Excellence in every deliverable
  • Innovation in tools and methods
  • Integrity and transparency
  • Customer focus — built around your operation

Bring one decision you're stuck on.

In 30 minutes we'll tell you whether scheduling or simulation can answer it, and what data it would take.

gavin@gds-consulting.com
760-443-1952
Bradenton, Florida

Send a message